Construction Dumpster Rentals in Aurora, IL

We supply 10, 15, 20 and 30 yard roll-off containers to construction and demolition sites across Aurora, Kane and DuPage counties. Every job is priced against three things that decide the real cost: the 2 ton allowance included on every size, the $100 per ton charged above it, and whether the container sits on private property or in the public right-of-way, which is what determines if the City of Aurora needs a permit before we can deliver. A 10 yard is $320, a 15 yard is $360 and a 20 yard is $420. Half rentals start at $165 and a 30 yard is quoted against the job.

  • Flat prices published, weight terms stated up front
  • Sized against the material, not a chart
  • Clearance confirmed before the truck rolls
Construction Dumpster Rentals in Aurora, IL
10–30Yard roll-offs
2 tonsIncluded on every size
FlatPriced up front
Fox ValleyService area

Sizes and pricing

Choosing a Size Without Guessing

Most people size a container by volume. On construction jobs, weight decides first. Every size below includes up to 2 tons, and additional weight is billed at $100 per ton. Half rentals start at $165.

10 Yard

$320

Tight sites and controlled demolition where there is nowhere to put a bigger box. This is also the right call for dense material: concrete, brick, dirt and tile reach the weight allowance long before they fill the container.

15 Yard

$360

Deck tear-offs, bathroom and kitchen remodels, flooring pulls, fencing, and mid-size cleanups between phases. Still fits on a residential street or a tight driveway without taking the whole approach.

20 Yard

$420

The standard job-site roll-off. Whole-job mixed C&D, framing lumber, drywall, roofing tear-offs and multi-room renovations. If you are between 15 and 20, take the 20, because a second haul costs more than the extra capacity.

30 Yard

Call for a quote

For jobs producing debris continuously: large remodels, additions, full tear-outs and multi-phase work where the container never really gets a rest. Quoted against the job, so tell us the material and the timeline.

Weight math

What 2 Tons Actually Looks Like, by Material

Every container we deliver includes up to 2 tons and bills $100 per ton above it. The practical question on a job site is not how many cubic yards the box holds, it is how many cubic yards of your material fit inside 4,000 pounds. For dense demolition debris the answer is roughly one cubic yard, which is why a 10 yard container of concrete costs less to run than the same concrete loaded into a 20 yard of mixed debris.

MaterialWeight per cubic yardReaches 2 tons atContainer that suits it
Broken concrete, block3,700 to 4,000 lbabout 1 cubic yard10 yard, nothing else in it
Soil and clay fill2,200 to 2,700 lbabout 1.5 cubic yards10 yard, nothing else in it
Brick and masonry3,000 to 3,300 lbabout 1.2 cubic yards10 yard, nothing else in it
Asphalt shingle tear-offabout 250 lb per square, per layerabout 16 squares of single layer10 or 15 yard, roofing only
Plaster and lath1,400 to 1,800 lbabout 2.5 cubic yards10 or 15 yard
Tile and mortar bed1,800 to 2,200 lbabout 2 cubic yards10 or 15 yard
Mixed construction debris400 to 600 lbabout 8 cubic yards20 yard
Framing lumber, sheathing300 to 400 lbabout 11 cubic yards20 or 30 yard
Drywall400 to 500 lbabout 9 cubic yards20 yard
Furniture, fixtures, cabinetry200 to 300 lbmore than the container holds20 or 30 yard

These are planning figures used to size a container before a job starts, not a quote and not a guarantee. Moisture, mixed loads and compaction all move the real number, and the scale ticket at the transfer station is what actually governs the invoice. Call 630-294-1340 and describe the material if you want it sized against the job rather than the table.

  • Concrete, brick, block and soil reach the allowance at roughly a third of a 10 yard container
  • A 20 square roof at two layers is around 5 tons of shingles, which is a container of its own
  • Mixed construction debris runs 400 to 600 lb per cubic yard, so a 20 yard rarely goes over
  • Wet material weighs materially more than the same material dry, and rain lands in an open box
  • The scale ticket governs the invoice, not the estimate, and we pass the ticket through at $100 per ton

What actually drives the cost

Weight Runs Out Before Space Does

Standard construction debris moves easily. Framing lumber, drywall, sheathing and flooring fill volume at a predictable rate.

Heavy material behaves nothing like that. Shingles, concrete, brick and dirt can pass 2 tons while the container still looks half empty, and everything past the allowance is billed at $100 per ton. A 20-yard box looks like the safe choice right up until a roof tear-off goes into it.

Mixing dense material into general debris looks efficient and usually is not. It raises the weight, it can push a clean load into a higher disposal rate, and it complicates what can be recycled. Plan the load before the drop and you avoid the argument after the pickup.

Before you load

  • Shingles, concrete, brick and dirt hit the limit long before the box fills
  • Keep clean heavy loads separate from mixed C&D where you can
  • Rain-soaked debris weighs noticeably more than the same debris dry
  • Tell us the material before delivery, not after the weigh-in

Debris by trade

What Your Trade Actually Puts in the Box

Two crews can fill the same 20-yard and get very different tickets, because the material decides the weight and the weight decides the price. This is what we see across Aurora job sites, and what we would tell you to book before the first load goes in.

  • Roofing tear-off: the heaviest common load on a residential job. Layered shingles on an older Aurora house pass 2 tons fast, so a 10 or 15-yard kept to roofing alone usually beats one big mixed container
  • Concrete, brick, block and dirt: a 10-yard on its own, every time. Dense material fills the weight allowance at roughly a third of the container
  • Framing, drywall and sheathing: high volume, low weight. This is where the 20-yard earns its keep and where you rarely see an overage
  • Flooring pulls: depends entirely on what is under it. Carpet and laminate are light, while tile, mortar bed and old subfloor are not
  • Siding, windows and doors: awkward rather than heavy. Volume runs out before weight, so size on the pile rather than the tonnage
  • Full gut and mixed C&D: a 20 or 30-yard, with the dense material pulled out into its own container rather than mixed in

Concrete and soil

Clean Fill Is Cheaper Than Landfill, Until You Mix It

Illinois treats uncontaminated concrete, brick, block and soil differently from general waste. Kept clean, that material can go to a clean construction and demolition debris facility, the kind of site the Aurora area has in Heartland Recycling, rather than through landfill disposal. Kept clean is the operative phrase. Throw one bag of general job-site trash on top of a clean concrete load and the whole container stops qualifying, which changes both where it can go and what it costs to take.

If your job is producing both, tell us at booking. A dedicated container for the dense material alongside a general one is very often cheaper than a single mixed box, and it is the single easiest saving on a demolition job. Call or text 630-294-1340 and describe the phases.

  • Keep concrete, brick, block and clean soil in their own container with nothing else in it
  • No wood, drywall, plastic, insulation or general trash thrown on top of a clean load
  • Rebar in concrete is usually fine, but say so when you book rather than at pickup
  • Painted, treated or contaminated material is not clean fill, whatever else it is made of
  • Mixed loads price as general waste, which is the cost people do not see coming

Permits

Aurora Right-of-Way Permits for a Job-Site Container

Placement decides the paperwork. On private property there is none. In the public right-of-way there are two separate documents, a surety bond requirement, and a review window that has stalled more Aurora jobs than any other item on this page.

01

Private property needs no permit. Driveway, lot, or anywhere inside the property line clear of the sidewalk. Most job sites fall here and we can deliver as soon as a truck and container are free.

02

The right-of-way needs two filings, not one. The City of Aurora requires the Obstruction in R.O.W. (DUMPSTER, POD, etc) permit application, and a separate Obstruction in R.O.W. Hold Harmless Agreement. Both are published as PDFs under Residential/Commercial on the city's Permit Applications page. A surety bond applies to Dumpster and Obstruction in ROW work under Aurora's contractor registration rules, and registration and permit tracking run through the city's eTRAKiT portal. Confirm the current fee and bond amount with the Division of Building and Permits on (630) 256-3130 before you price the job, since those figures change.

03

Approval takes a few business days. That single fact is what turns into standing time: a street placement cannot be same-day, so the filing has to happen before the crew is booked, not alongside it. Driveway and private-lot drops carry no such wait. General city contact is 311 or 630-256-4636.

Demolition

Before You Take a Structure Down: the 10 Working Day Notice

A container is the last thing to arrange on a demolition, not the first. Two filings sit ahead of it, and both have lead times that make an ordered container useless if they are missed.

01

Illinois EPA asbestos notification. Work covered by the federal asbestos NESHAP requires a Demolition/Renovation/Asbestos Project Notification Form submitted to the Illinois EPA with a $150 fee, at least 10 working days before work starts. Ten working days is a fortnight of calendar time once weekends land in it. The rule is aimed at commercial and multi-unit structures, and a single-family house is generally outside it, but the exemptions are narrower than people assume and a government-ordered demolition can pull a house back in. Confirm your project's status with the Illinois EPA rather than assuming.

02

A City of Aurora demolition permit is a separate application again, published alongside the right-of-way forms under Residential/Commercial on the city's Permit Applications page. If the container also needs to sit on the street, that is a third filing with its own review window.

03

Sequence it backwards from the notification. File the asbestos notice, then the demolition permit, then the right-of-way permit if you need one, and book the container against the day debris actually starts moving. Call us with the demolition date and we will set delivery to it. 630-294-1340.

Delivery

What It Takes to Land a Roll-Off in Aurora

Getting a container on site sounds simple until it is not. The driver needs a straight approach, ground that will hold the truck, room to turn, and clearance overhead: lines, branches, canopies and structures all count.

Miss one of those and the container cannot go where you wanted it. That is when time disappears into repositioning or rescheduling. Tighter streets downtown and through the older parts of Aurora make it more common than people expect, and a small tear-out near Aurora University can be harder to reach than a much bigger job out by Route 59.

We confirm clearance before the truck rolls. It is a short conversation that prevents the most avoidable delay in this whole process.

Aurora is not uniform

  • Downtown: tight alleys, limited staging, debris comes off in stages
  • Older neighborhoods: narrow approach, heavier plaster and lath loads
  • Fox Valley Mall corridor: phased work, so pickups have to match the rhythm
  • Newer subdivisions: space is fine, the constraint is timing once demo starts

Accepted materials

What Goes In and What Slows You Down

Loads without a problem

  • Framing lumber, offcuts and sheathing
  • Drywall, plaster and lath
  • Flooring, subfloor and cabinets
  • Roofing shingles and tear-off debris
  • Fencing, decking and general mixed C&D

Keep these out

  • Liquid paint and solvents
  • Automotive fluids and chemicals
  • Tires and batteries
  • Propane tanks and anything pressurized

Transfer stations reject contaminated loads at inspection, and one prohibited item can hold up an entire haul, which on an active site means the container stays full and in the way. If you are not sure about a material, ask before it goes in. It takes ten seconds on the phone.

Job phasing

Keeping a Container on Schedule

The container is part of the schedule, not an afterthought. On a phased job the failure mode is always the same: the box fills mid-week, the crew keeps working, debris stacks beside it, and by the time anyone calls there is a day of double handling to undo. Tell us the phases when you book and we will set the window and the pulls against the schedule rather than against a calendar.

If the job outruns the container, the options are a pull and replace or an extension of the window. Which one is cheaper depends on the phase you are in and how much is left to come out, so call and say where the job is rather than guessing. Same-day works for driveway and private site drops when a truck is free, but a street placement never can, because of the permit review window covered above.

  • Book the container against the phase that produces the debris, not the start of the job
  • Call for the pull when the load is level with the top rail, not after it is over
  • A container that cannot be tarped cannot legally be hauled, so overfilling costs you a day
  • Demolition almost always moves faster than planned once it starts
  • Street placements need the permit filed before the crew is booked, not alongside it

Get a Construction Dumpster in Aurora

Tell us what you are working on and where it is. We will match the container to the job conditions rather than just the square footage, quote it flat, and get it in place without interrupting the work.

On job sites across Aurora and throughout Kane and DuPage counties: Naperville, Oswego, Batavia, Geneva and Montgomery.

FAQ

You Ask, We Answer

01

How does it work on an active job site?

We start with the conditions, not the container. Access, what the debris actually is, where it is being generated, and how the job is phased all change what should be delivered and where it should sit. Once that is clear we schedule delivery, place the container so it does not block the work, and coordinate pickup around the phases rather than across them.

02

What size do I need for a tear-off or a demo?

Work from the material first. A 10-yard suits tight sites and dense debris like concrete, brick and dirt. A 15-yard handles deck tear-offs, flooring pulls and single-room remodels. A 20-yard is the standard job-site box for mixed C&D, framing and roofing. A 30-yard is for work that produces debris continuously. If you are genuinely torn between two sizes, the larger one is usually cheaper than a second haul.

03

Do I need a permit to put a dumpster on an Aurora street?

Not on private property. In the public right-of-way the City of Aurora requires the Obstruction in R.O.W. (DUMPSTER, POD, etc) application and a separate Hold Harmless Agreement, both published as PDFs on the city's Permit Applications page, and a surety bond applies to Dumpster and Obstruction in ROW work under Aurora's contractor registration rules. Approval takes a few business days, so a street placement is never same-day. Division of Building and Permits, (630) 256-3130.

04

What does a construction dumpster cost?

A 10-yard is $320, a 15-yard is $360 and a 20-yard is $420, each including up to 2 tons, with additional weight at $100 per ton. Half rentals start at $165 and a 30-yard is quoted against the job. The variable that moves the final number is weight, which is why we ask what the material is before quoting rather than after the weigh-in.

05

What can't go in the container?

Liquid paint and solvents, automotive fluids and chemicals, tires, batteries, propane tanks and anything pressurized. Beyond that, the thing worth planning is mixing: dense material loaded in with general debris raises the weight, can push a clean load into a higher disposal rate, and complicates recycling. Lumber, drywall, plaster, flooring, shingles, fencing and mixed C&D are all fine.

06

How long is the rental, and what if the job runs long?

The rental window is agreed when you book and set against the job rather than a fixed calendar block. If the work outruns it, the choice is a pull and replace or an extension of the window, and which is cheaper depends on how much debris is still to come out. Call before the container is buried rather than after.

07

What size do most job sites use?

The 20-yard, at $420 with 2 tons included. It takes mixed construction and demolition debris, framing, drywall and general tear-out at a rate that suits most residential-scale jobs, and it still lands on a normal approach. Dense material is the exception and belongs in a 10-yard of its own.

08

What happens if I go over the weight limit?

Every size includes up to 2 tons, and additional weight is billed at $100 per ton off the scale ticket. It is not a penalty, it is the disposal cost passed through. The way to avoid it is material separation rather than a bigger container, since a bigger box of heavy debris weighs the same as a small one.

09

Can concrete and dirt go in with the rest of the debris?

They can, and it is usually the expensive choice. Uncontaminated concrete, brick and soil can be handled as clean fill, but only while nothing else is in the container. Mixed in with wood, drywall and general trash, the whole load prices as general waste. On demolition work a dedicated container for the dense material normally costs less overall.

10

Where does Aurora construction debris actually go?

It depends what it is. Dense, uncontaminated material is directed toward clean construction and demolition facilities such as Heartland Recycling in the Aurora area. Mixed construction debris moves through standard transfer and landfill processing, including Settler's Hill in Geneva and Kane County transfer stations.

11

Can you deliver to an active site the same day?

Often, when a truck and the right container are free and the placement is confirmed and clear. It works best for private-site and driveway drops. A street placement can never be same-day, because the City needs a few business days to review the right-of-way permit.

12

What are the mistakes that actually cost money?

Three, in order. Undersizing and paying for a second haul. Mixing dense debris into a general load and pushing the whole container into a heavier bracket. Loading above the top rail, which stops the container being tarped and turns a scheduled pull into a return trip.

13

Is it cheaper to haul it myself?

For a single load out of a small job, yes, if you have the truck and the time. On anything phased it stops being true quickly: every run is fuel, a gate fee and most of a working afternoon, and the debris sits on site between trips. A container gives the crew somewhere to put waste every hour they are working.

14

Do I need to notify anyone before a demolition?

For work covered by the federal asbestos NESHAP, yes. A Demolition/Renovation/Asbestos Project Notification Form goes to the Illinois EPA with a $150 fee at least 10 working days before work starts, which is about two calendar weeks once weekends are counted. Commercial and multi-unit structures are the usual targets and a single-family house is generally outside it, but confirm your project with the Illinois EPA rather than assuming.

15

How much material does 2 tons actually hold?

It depends entirely on density. Broken concrete runs 3,700 to 4,000 lb per cubic yard, so 2 tons is about one cubic yard. Mixed construction debris runs 400 to 600 lb per cubic yard, so 2 tons is closer to eight. That is why dense material belongs in its own 10 yard container and why a bigger box does not solve a weight problem.

16

How much does a roof tear-off weigh?

Asphalt shingles run about 250 lb per square, per layer, a square being 100 square feet. A 20 square roof stripped of two layers is therefore in the region of 5 tons, well past the 2 ton allowance on any size. Roofing almost always wants its own container, sized to the weight rather than to how the pile looks.

Scroll to Top